Télécharger Imprimer la page

Mirolin BD53 Instructions D'installation page 8

Masquer les pouces Voir aussi pour BD53:

Publicité

Les langues disponibles

Les langues disponibles

STEP 24: Install Door Handle (B5) by separating
the two clear washers. One goes on each side of the
glass door for the protection.
STEP 26: Hang Back Door Panel (B3) with the
white Door Guiding Rollers (B7) facing into the tub.
Back Marked Panel.
STEP 28: Apply Silicone on the outside of the
shower stall from the top to bottom of the Wall
Jamb (B1).
STEP 25: Door Handles installation. Handle (B5) is
on same side as the Door Guiding Rollers (B7). Door
handle is on the rear panel of the shower and one
door handle is on the front panel.
STEP 27: Hang Front Door Panel (B4) with the white
Door Guiding Rollers (B7) facing towards you.
Front Marked Panel
STEP 29: Apply Silicone along the Sill outside the
shower from wall to wall. Cure time is 24 hrs.
8

Publicité

loading

Ce manuel est également adapté pour:

Bd55Bd57ps