ASSEMBLY CONTINUE
NOTE: INSTALLATION MUST BE DONE BY A QUALIFIED, LICENSED PLUMBER
5. Place cold and hot handles to the faucet and
tighten the hex screws. Note: There are two sets
of hex screws. One set is to adjust the handle to
make sure it sits horizontally level and one set
is to secure the handles to the body.
3. Secure the faucet base to the cold and hot water
pipe lines. It is imperative that the licensed
contractor measure the thickness of the sheetrock
used, tile used and added accents to make sure that
when the wall is fully closed that the hot and cold
controls are set to the correct depth in the wall to
function up to the desired needs.
4. Close the wall with the sheetrock and ceramic
tiles around exposed handle cartridges leaving
enough space to thread the handle covers into
place. Place the front cover to the faucet base
and thread on the handle covers until secure.
5
6. Screw the spout to the faucet. You may
choose to use pipe tape.
SHEETROCK
SHEETROCK
HANDLE
CARTRIDGES
FRONT
COVER
HANDLE
COVERS
HEX SCREW
HANDLES
SPOUT