Girder (B) to outside
3.
If Post Mount Hardware is
installed, position bottom of Posts in
Hardware.
Lag Screws
(not included)
Toll Free 1-888-658-1658
4.
Secure Post to Post Hardware with appropriate
hardware such as lag bolts or a sufficient number
of screws.(Hardware Not Supplied)
www.outdoorlivingtoday.com
Page 5
Important: you will need the help
of 2-3 people while lifting and
positioning the completed
Post/Side Girder Sections into
place.
2.
Lift up a completed
Post/Girder Section slowly and
carefully. Make sure B-Girders
are facing outward.
C
Deep Notch facing Up.
sales@outdoorlivingtoday.com
Post
Hardware
5.
Locate Girder (C)
and lift into
position between
both B-Girders. The
C-Girder has a deep
notch facing up on
each end.