INSTALLATION
Typical Installation
9
8
7
6
Outlet minimum
1
4 ft (1.2 m) above floor level
2
Union
3
Gas tight basin
4
Air bleed hole
1
12
11
10
2
3
4
5
5
Pump
6
Intake
7
Pump power cord
8
Basin cover
9
Basin vent
Typical Installation
10
Discharge
11
Check valve
12
Gate valve
INSTALLATION
5