2. INSTALLATION
2.3 DRILLING THE WALL (P5)
Please note: If you are drilling the hole above
ground floor level, please ensure that an area
has been secured and while the holes are drilled
the outside area is supervised, until drilling has
been completed.
INTAKE AND OUTLET HOLES
-
This operation should be carried out using
the proper tools (diamond tip or core borers
drills with high twisting torque and adjustable
rotation speed).
-
Fasten the template to the wall taking
care to check the distance from the floor and
or ceiling and keep it horizontal by using a
spirit level.
-
Use a pilot drill to mark the centre of each
core hole to be drilled,
Use a core boring head having a diameter of
162 mm to drill the two holes for intake and
outlet the air.
It is recommended that the holes must
have a slightly downward inclination of
3-5 degrees to prevent any backflow of water
from the pipes.
3° INCLINATION
Indoor
DRAINAGE HOLE (P13)
This air conditioner has a double system to
drain the condensate moisture automatically.
Before install the Air Conditioner choose which
is the suitable system for your installation.
Please read carefully the follow instructions.
System "A": drill a hole through the wall mea-
suring 30mm in diameter in the position shown
in the paper template. Drainage occurs by
gravity. For this reason, it is essential for
the drain line to have a minimum downward
inclination at least 3 degrees through out
its length: connect the drain pipe (from rubber
terminal) to the air conditioner (back side) after
unplugged the black rubber cup (see picture
P13). With this solution you can drain the
condensate moisture to a suitable place to do
not cause any problems to your neighbours.
If use system "A", please do not unplug the black
rubber cup from system "B".
Soft terminal
P5
Outdoor
System "A" is more common use , and the
discharge pipe go outside where there is no
problem to connect or to discharge it , this
solution is OK for hot country and normal cold
temperature out side .
10
A
Hard terminal
ENGLISH
P13
A
B
B