GB
Attaching cut-out for PWS air/water heat exchangers
Requirements
-
All general requirements are fulfilled, see
-
The unit is de-energized.
Required tools and material
-
Saw
-
Use a switch cabinet cutter, if applicable
-
Protective covers
Procedure
▪ Use a protective cover to protect the switch cabinet from chips.
▪ Provide the switch cabinet with cut-out (2) and holes (1).
▪ For the prescribed dimensions (3) cut-out radius (4), refer to the figure Exterior view of the switch cabinet cut-
out.
▪ Deburr the cut edges.
▪ Remove chips and assembly waste from the switch cabinet.
Cut-out and holes have been created.
Operating manual PWS and PWI 6502 785408476 © Pfannenberg GmbH
General assembly requirements
Page 14 / 31