4
4
A.
4.
SHOWERHEAD AND TUB SPOUT INSTALLATION
FOR SHOWERHEAD INSTALLATION:
A.
FOR TUB SPOUT INSTALLATION:
SLIP-ON INSTALLATION:
B1
B2
IRON PIPE INSTALLATION:
1. Install
iron pipe nipple so the
2.
4.
A.
B1
B2
4.
INSTALLATION DE LA POMME DE DOUCHE ET DU BEC DE BAIGNOIRE
INSTALLATION DE LA POMME DE DOUCHE :
A.
INSTALLATION DU BEC DE BAIGNOIRE :
pas de tube PEX pour raccorder le bec.
B1
B2
1
3
2
4
Important:
the nipple projects out
Importante:
Important:
B1.
1
2
wall sur ace 3
mm) to
is r
wall.
3
B2.
)
ppl
plique cinta para plomero
ppliquez r
mm).
66621 Rev.F