Télécharger Imprimer la page

Sunjoy NHSS-G-SJGPC Manuel De L'utilisateur page 16

Chauffe-terrasse
Masquer les pouces Voir aussi pour NHSS-G-SJGPC:

Publicité

Les langues disponibles

Les langues disponibles

ASSEMBLY INSTRUCTIONS
7-1. Insert hose of Head Assembly into Upper Pole (F).
Secure Head Assembly to pole with Stainless Steel Bolts.
7-2.Put the Upper Pole ( F) onto the Lower Pole (H),
using 4pcs Screw 3/16" (KK) to firmly secure 2pcs Pole.
The warning label on the Upper Pole should be on the
same side as the flat plate of the Lower Pole.
Note: The control knob on head assembly should
be above the decal on pole. When applicable,
visually checking portions of the hose assembly
located within the confines of the heater post.
Hardware Used
KK
Screw 3/16"
8. WARNING:Remove protective cover before
assembling.
Note: If necessary for proper alignment of reflector
sections, loosen each bolt prior to further assembly
and retighten after sections are aligned.
9. Slide two Reflector Panels together.
Insert one Screw M6 x 10 (HH). Slide one Washer Φ6
(GG) over threaded end of Screw M6 x 10 (HH) and
screw on Cap Nut (II) loosely.
Hardware Used
Washer Φ6
GG
HH
Screw
M6 x 10
II
Cap Nuts
x 4
x 9
x 9
x 9
7
CC
F
8
9
II
GG
HH
16
KK
A
B
H

Publicité

loading

Ce manuel est également adapté pour:

A3060168002024100208