Roughing-In/Plan de raccordement/Diagrama de instalación
Finished Wall
Mur fini
Pared acabada
8-1/4"
(21 cm)
1/2" (1.3 cm) D. Mounting
Hole In Pedestal
Orfice de fixation en
colonne de 1/2" (1.3 cm) D.
Orificio de fijación de 1/2"
(1.3 cm) D. en el pedestal
1/2" (1.3 cm) Anchor Holes in
Lavatory
Orifices d'ancrage en lavabo
de 1/2" (1,3 cm) D.
Orificios de anclaje de 1/2"
22-1/8" (56.2 cm)
(1,3 cm) D. en el lavabo
13-5/8" (34.6 cm)
10" (25.4 cm)
3/8" Hot
Chaud 3/8"
3/8" Caliente
4" (10.2 cm)
Kohler Co.
K-2258-1
2-3/8" (6 cm)
8"
(20.3 cm)
22"
(55.9 cm)
27" (68.6 cm)
2-3/4" (7 cm)
8-7/8"
(22.5 cm)
3/8" Cold
Froid 3/8"
3/8" Fría
1-1/4" OD
Ø Ext. 1-1/4"
1-1/4" D.E.
5
K-2258-4
4" (10.2 cm)
2-3/8"
(6 cm)
K-2258-8
4" (10.2 cm)
2-3/8"
(6 cm)
Finished Wall
Mur fini
Pared acabada
35"
3-1/4"
(88.9 cm)
(8.3 cm)
1087255-2-A