10
4
Y
EARLY MAINTENANCE AND REPAIRS
In this paragraph you will find:
—
a list of maintenance operations to be carried out once a year;
—
a description of main maintenance and/or repair procedures.
However, the above are intended to help experienced technical personnel using suitable tools to carry out all maintenance
and repair operations. Only specialized technical personnel may service the machine.
T
HE FOLLOWING OPERATIONS ENTAIL ACCESS INSIDE THE MACHINE
PERSONNEL MAY ACCESS THE MACHINE
C
OMPLY TO ALL INDUSTRIAL INJURY LEGISLATION
LUTELY NECESSARY TO CARRY OUT TESTS
Yearly overhaul
The main operations for the yearly overhaul are:
—
Check-up and cleaning of the internal parts, and of the air condensator in particular;
—
Checking of the general operating conditions of the device.
The following procedures describe the correct way of effecting the maintenance operations requested by the device.
Pump motor removal
1
1.
Remove the right lateral panel unscrewing the four fixing screws and find the earth buckle [J2] ON THE MOTOR'S
BODY. If this is not easily accessible, remove the left lateral panel also;
Disconnect the connector of the motor's cable [J1], noting the contact's position, and disconnect the earth buckle
[J2] unscrewing the screw.
2.
Unscrew the 4 bolts (V) placed on top of the motor (C), remove the motor towards the bottom as shown in
illustration 2.
When reassembling the motor, always remember to connect the earth buckle [J2], with the motor and check that
the contacts of the connector [J1] are correctly positioned.
Montapanna automatico - Automatic cream-whipper - Machine automatique à Chantilly
CW5 - 37b (creamy us) [S.3]
.
.
2
Automatischer Schlagsahnebereiter - Monta-nata automático
,
ONLY CERTIFIED TECHNICAL
. C
UT POWER OFF UNLESS POWER IS ABSO
-