Systainer; Maintenance And Care - Rotex RO 125 FEQ Guide D'utilisation

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

A
B
9-1

Systainer

9
Many Festool products are shipped in a unique
system container, called "Systainer".
This provides protection and storage for the tool
and accessories. The Systainers are stackable
and can be connected together. They also can be
conntected atop Festool CT dust extractors.
To open the Systainer:
– Turn the T-loc [9-1] to the position
To lock the Systainer:
– Turn the T-loc [9-1] to the position
To connect two Systainers:
– Place one Systainer on the top of the other
(Fig. 9 A).
– Turn the T-loc [9-1] to the position
(Fig. 9 B).
The Systainers are connected and locked.
 A new generation Systainer is connectable on
top of a previous generation Systainer by the
four latches of the previous Systainer.

Maintenance and care

requiring the motor housing to be opened must
be carried out only by an authorized service work-
shop. Maintenance or repair work carried out by
an unauthorized person can lead to the incorrect
connection of the wiring or other components,
which in turn can lead to accidents with serious
consequences.
mains supply socket before carrying out any work
on the machine!
Always keep the tool and in particular the ventila-
tion slots clean.
10
All maintenance or repair work
Always remove the plug from the
.
.
or

Publicité

Table des Matières
loading

Table des Matières