Télécharger Imprimer la page

Publicité

Liens rapides

Instructions / Instructions De Montage / Instrucciones
R010BU
R110BU
ICONA
R013BU
R113BU

Publicité

loading

Sommaire des Matières pour Fantini Rubinetti ICONA R010BU

  • Page 1 ICONA Instructions / Instructions De Montage / Instrucciones R010BU R013BU R110BU R113BU...
  • Page 3 PRE-INSTALLATION - PRÉ-INSTALLATION - PREINSTALACIÓN R010BU 2 9/16" 1/4" 3 15/16" 3 15/16" 5 15/16" R013BU 1/4" 2 9/16" 3 15/16" 3 15/16" 7 7/8" These mixers can be used with high-pressure hot water accumulators or with instant water heaters. Ces mitigeurs peuvent être utilisés avec des accumulateurs d’...
  • Page 4 PRE-INSTALLATION - PRÉ-INSTALLATION - PREINSTALACIÓN R110BU 1/4" 2 9/16" 2 3/4" 5 15/16" 3 15/16" 3 15/16" R113BU 2 9/16" 2 3/4" 1/4" 3 15/16" 3 15/16" 7 7/8" These mixers can be used with high-pressure hot water accumulators or with instant water heaters. Ces mitigeurs peuvent être utilisés avec des accumulateurs d’...
  • Page 5 TECHNICAL DETAILS - DONNÉES TECHNIQUES - DATOS TÉCNICOS Minimum pressure Pression minimum Pression mínima 1 BAR Maximum pressure Pression maximum Pression máxima 10 BAR Recommended working pressure Pression optimale de service Pression de trab. aconsejada 2-5 BAR Max. water temperature Température maximum Temperatura máxima 80°...
  • Page 6 INSTALLATION - INSTALLATION - INSTALACIÓN R010BU ASSEMBLY PHASES - PHASE D’ A SSEMBLAGE- FASES DE MONTAJE R013BU 14 15 R110BU ASSEMBLY PHASES - PHASE D’ A SSEMBLAGE- FASES DE MONTAJE R113BU 20 21...
  • Page 7 INSTALLATION - INSTALLATION - INSTALACIÓN 5/64”...
  • Page 8 INSTALLATION - INSTALLATION - INSTALACIÓN 25/64” 25/64” 25/64”...
  • Page 9 INSTALLATION - INSTALLATION - INSTALACIÓN...
  • Page 10 INSTALLATION - INSTALLATION - INSTALACIÓN 9/16...
  • Page 11 INSTALLATION - INSTALLATION - INSTALACIÓN 1 5 m METAL...
  • Page 12 INSTALLATION - INSTALLATION - INSTALACIÓN 9/16” 9/16” R013BU R113BU R010BU R110BU...
  • Page 13 INSTALLATION - INSTALLATION - INSTALACIÓN...
  • Page 14 INSTALLATION - INSTALLATION - INSTALACIÓN R013BU R113BU R010BU R110BU...
  • Page 15 INSTALLATION - INSTALLATION - INSTALACIÓN 9/16” 9/16”...
  • Page 17 9/16” 9/16”...
  • Page 18 INSTALLATION - INSTALLATION - INSTALACIÓN R010BU R110BU 5/64”...
  • Page 19 INSTALLATION - INSTALLATION - INSTALACIÓN...
  • Page 20 INSTALLATION - INSTALLATION - INSTALACIÓN METAL TEFLON...
  • Page 21 INSTALLATION - INSTALLATION - INSTALACIÓN R013BU R113BU 5/64”...
  • Page 22 INSTALLATION - INSTALLATION - INSTALACIÓN...
  • Page 23 INSTALLATION - INSTALLATION - INSTALACIÓN METAL TEFLON...
  • Page 24 INSTALLATION - INSTALLATION - INSTALACIÓN OPEN OPEN...
  • Page 25 - UTILISATION - USO On first use or following prolonged periods of inactivity, do not use the first half-litre of drinking water dispensed. Shut off the plumbing system in the event of a long absence. Check the water-tightness regularly. Lors de la première utilisation ou après une longue période de non utilisation, ne pas consommer le premier demi-litre d’eau potable qui sort du robinet.
  • Page 26 CLEANING - NETTOYAGE - LIMPIEZA Clean the surfaces using a soft cloth soaked in liquid soap diluted in water, then rinse and dry thoroughly. Never use detergents containing abrasive substances or containing muriatic acid, vinegar, ammonia, acetone, bleach, domestic acids, disinfectants in general or abrasive sponges. CAUTION! The use of products other than those recommended may damage the surfaces irreparably, in which case the manufacturer will not be held liable.
  • Page 28 Fratelli Fantini SpA via Buonarroti, 4 Pella (NO) Italia T +39 0322 918411 r.a. F +39 0322 969530 fantini@fantini.it www.fantini.it...

Ce manuel est également adapté pour:

Icona r013buIcona r110buIcona r113bu