Télécharger Imprimer la page

Brooks Instrument 1305 Manuel D'installation Et D'utilisation page 15

Publicité

Les langues disponibles
  • FR

Les langues disponibles

  • FRANÇAIS, page 25
Installation and Operation Manual
X-VA-1305-eng
Part Number: 541B080AAG
May, 2016
3-1 Operating Instructions
After the flowmeter has been properly installed in the system, it is ready for
operation.
Plastic protective sleeve must remain over glass
tube.
Fasten meter windows securely.
Do not operate above pressure and temperature
limits.
Avoid pressure and flow surges.
Do not service or repair while pressurized.
Read and understand instruction manual.
Failure to comply could result in serious personal
injury or property damage.
WARNING
GLASS TUBE EXPLOSION HAZARD
Protective sleeve must remain over glass tube.
Fasten meter windows securely.
Failure to comply could result in serious personal
injury or property damage.
Section 3 Operation
Model GT1305
WARNING
GLASS TUBE
EXPLOSION
HAZARD
3-1

Publicité

loading