Télécharger Imprimer la page

KitchenAid 720-0819GL Instructions D'installation Et Guide D'utilisation Et D'entretien page 32

Publicité

Les langues disponibles

Les langues disponibles

Change Grill Main Burner Valve Orifices
1.
Remove the grates and flame tamers.
2.
Remove the cotter clip that holds the burner in place. Set
the clip aside.
3.
Remove the burner from the grill by lifting the burner out.
4.
Use a 6 mm socket and wrench or 6 mm nut driver to
remove the LP brass orifice from the end of the gas valve.
The main burner NG orifice is located behind the LP orifice,
so no additional orifice needs to be installed.
A.
Main burner orifice
IMPORTANT: Check that the LP orifice is properly
removed inside of the burner opening.
5.
Reinsert the burner by sliding the middle tube of the gas
burner over the gas orifice and reattach using the cotter
clip previously removed. Repeat the procedure for each
main burner.
6.
Position the igniters so they are 3.18 mm (1/8") away from
each burner.
7.
Open the manual shutoff valve in the gas supply. The
valve is open when the handle is parallel to the gas pipe.
8.
Test all connections using an approved non-corrosive
leak-detection solution. Bubbles will show a leak. Correct
any leak found
Record Conversion
The LP appliance nameplate is located inside the grill cabinet
on the left-hand side. Once converted, place the NG appliance
nameplate as close as possible to the current LP appliance
nameplate without covering it.
A
In the last page of the Use and Care Guide, write "Converted to
Natural Gas". Also, record the conversion date and the
technician/company that performed the conversion.
32
A.
Closed valve
B.
Open valve

Publicité

loading

Ce manuel est également adapté pour:

730-0819gl1902495