5. PARALLEL OPERATION
5.1. Remote sensing and current balance
FPS-T1U
FPS-1000 Module A
CS
FPS-1000 Module B
CS
FPS-1000 Module C
CS
ON/
ON/
OFF_1
OFF_1
A
B
6. SERIES OPERATION
Up to 3 units of the same voltage and current rating can be used for increased output voltage
It is recommended that diodes be connected in parallel with each unit output to prevent reverse voltage.
Each diode should be rated to at least the power supply rated output voltage and output current.
FPS-T1U
FPS-1000 Module A
FPS-1000 Module B
FPS-1000 Module C
ON/
ON/
ON/
OFF_1
OFF_1
OFF_1
A
B
+V
+S
-S
-V
+V
+S
-S
-V
+V
+S
ON/
-S
OFF_1
C
-V
Fig 5-1
+S
+V
(*)
-V
-S
+S
+V
(*)
-V
-S
+S
+V
(*)
-V
-S
C
Fig 6-1
Up to 8 FPS1000 units of the same output
voltage rating can be connected in parallel.
By connecting the CS signal between
+S
the paralleled units, automatic current
balance is achieved,
-S
with +/-10% accuracy.
+S
+S
-S
-S
Derate the total output current by 10%
+S
when using parallel operation to prevent
overload condition.
-S
The built-in Oring diodes on the main
output and the 12V Auxiliary output allow
N+1 operation.
For input voltages less than 100Vac,
maximum output Power derated by 10%
of the Power rating.
+S
+V
LOAD
-V
-S
(*) Diodes are user supplied
Series operation is not applicable
for units with I2C bus option.
+V
LOAD
-V