Pentair Water Pool and Spa MagicFalls Guide D'installation page 5

Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

  • FRANÇAIS, page 18
Installation
1. Preparing the Niche for the MagicFalls
Notch the bond beam as shown (Figure 1). Attach a board to the side of the pool as shown. Make
sure this board is level. The board will be used to set the level of the waterfall and create a dam for
the mortar bed.
Bond beam
Notch
Board
Figure 1
Prepare the Niche
5

Publicité

Table des Matières
loading

Produits Connexes pour Pentair Water Pool and Spa MagicFalls

Table des Matières