4
Installation
The equipment should be installed in a dry and well aired location, not in direct sunlight. Installation should carried out in
accordance with building regulations, rules and best practice for accident prevention and fire prevention standards.
The ground should be level, clean and dry.
Keep the equipment away from heat sources (ovens, radiators etc.)
5
Assembly
All the panels are identified through a label that indicates their position. Proceed to the assembly of the panels as follows:
Insert the two inferior stud-pins with serrated lock washers in the fixing supports of the doors (Fig. 1);
Place the bottom panel in the ground; pay attention to the fact that the device should be slightly slanted backwards to
facilitate the closing of the doors and assure a perfect functioning. Small level differences can be compensated through
the regulation of feet (Fig. 2):
To fasten the hooks, being outside the box, turn the screwdriver in a clockwise movement (A)till it stops and then turn the
screwdriver in a counterclockwise movement (B) till it fastens (Fig. 3):
MNS00004.04
TEC
Assembly Instructions
Fig. 2
Fig. 1
N.º
MNS00004.04
Fig. 3
9/33