CONNECTIONS:
Connect the electrical and hydraulic connections according to the diagrams in this manual.
When connecting the oil pipes, pay particular attention to the pipe joint protection to
prevent foreign elements from entering the circuit and damaging the hydraulic system.
CONNECTIONS OF THE ELECTRIC CIRCUIT:
Follow the line path stated in the «electrical diagram» to connect the electrical circuit.
Only competent personnel are authorized to perform this type of operation.
Open the front cover of the control box.
Connect the power supply: The three-phase, 5-pole 400V (3 × 2.5 mm + 2x 1.5 mm)
power cables are connected to the control box L1, L2, L3, N and to the marked terminal.
The ground PE cable must first be connected to the marked terminal (Figure 15) and
then connected to the two bases.
If the lift is operated at 230V three-phase, a different electrical diagram must be used
which must be requested to the manufacturer (Figure 15)
Picture 14
- Connection of the up limit switch (SQ1):
- Connection of the lower limit switch (SQ2): See the connection on the wiring diagram
Figure17 up limit switch
CONNECTIONS: OIL PIPES CONNECTION:
Follow the oil pipe connection diagram.
Only qualified and authorized persons are allowed to carry
out such operations. Refer to the «oil pipe diagram»:
When connecting the hoses, pay attention to the oil pipe
guard to prevent impurities from entering the hydraulic
circuit.
When connecting the oil pipes, be sure not to mistake the oil pipe reference.
During the standard installation, the control unit is close to the vehicle entry direction. If
it is positioned to the right, it is necessary to adjust its oil pipe.
40
Picture 15
See the connection on the wiring diagram
Figure 18 lower limit switch
Picture 16
Figure19fixing position of
end switch