Anleitung PHR 100 SPK1
27.04.2006
GB
or the machine itself.
It is normal for the pump to leak a little; this is
necessary to avoid damage to the pump when it
is at a standstill.
Maintenance
Checking the water intake filter (Fig. 6)
Periodically check the intake filter in order to prevent
clogging, which could jeopardize operation of the
pump.
To do this, unscrew the connection coupling for the
water inlet hose from the device and clean the expo-
sed inlet sieve by placing it under running water.
Long periods of nonuse (electric pump)
If the machine is going to be stored for longer peri-
ods of time (i.e. over three months) in a room where
frost could develop, it is recommended that the
machine be filled with an antifreeze solution (similar
to the antifreeze solutions used for vehicles).
When the device is not used for an extended period
of time, lime deposits begin to form in the electric
pump, which in turn can lead to starting difficulties.
Technical data
Rated voltage:
230 V ~ 50 Hz
Protection class
Power input:
Operating pressure:
Operating pressure (EW bar):
max. 140 bar
Pump capacity
Max. water inlet pressure:
LPA noise level:
87,22 dB(A)
LWA peak noise level:
Weight
10
11:17 Uhr
Seite 10
Ordering replacement parts
Please quote the following data when ordering repla-
cement parts:
Type of machine
Article number of the machine
Identification number of the machine
Replacement part number of the part required
For our latest prices and information please go to
www.isc-gmbh.info
II / ®
1400 W
70 bar
300 l/h
4 bar
94 dB(A)
5,2 kg