6.
Ensure all horizontal boards are touching the post
wall. Take one 2
top rail as shown. Perform task for both left and
right sides of screen (Fig. 4).
7.
Insert post caps into posts at the top of the
screen (Fig. 5).
8.
Using post hole digger or shovel, dig (two) 12 -
14 inch holes 32
9.
Lift screen assembly and place screen long post
ends into dug holes, use level to ensure screen is
level. Fill in holes with soil and/or cement.
4
⁄
" #10 screw and drill it into the
1
2
⁄
feet apart (Fig. 6).
1
2
#10 2
Ground
Level
12"~14"
32
⁄
1
Fig. 4
⁄
" Screws
1
2
Fig. 5
Fig. 6
"
2