Télécharger Imprimer la page

Pfister Serrano LG48 Serie Manuel D'installation page 3

Masquer les pouces Voir aussi pour Serrano LG48 Serie:

Publicité

Les langues disponibles

Les langues disponibles

7
7B
7A
HOT
7 WATER SUPPLY CONNECTIONS
Connect water Supply Lines (7A) to Faucet Inlets (7B). Hot water supply lines go into left
inlet. Cold water supply lines go into right inlet. (Supply lines are not included). Please
follow manufacturer's instructions when installing supply lines.
8
8 POP-UP ROD CONNECTION
Insert Lift Rod (8A) into hole at the top of Spout (8B).
ENGLISH
7B
7A
COLD
8A
8B
3
DRAIN BODY INSTALLATION
9
9A
9 POP-UP INSTALLATION
Install and adjust Pop-Up (9A) using separate instructions supplied with the Pop-Up
assembly.
10
10 UNIT START UP
Turn on hot and cold water supplies, and check for leaks above and below the sink.
FAUCET FUNCTION
11
HOT
OPEN
11 VALVE FUNCTION
COLD valve: close-counterclockwise, open-clockwise; HOT valve: close-clockwise,
open-counterclockwise.
COLD
OPEN

Publicité

loading

Ce manuel est également adapté pour:

Serrano lg48-sr0k