INSTALLATION
Remove transport bolts
arning
!
ou must
remove the transport bolts from the bacside before
using the product.
Loosen the
transport bolts
ith a spanner.
Levelling the asher drer
arning
!
The loc nuts on all four feet must be screed tightl
the housing.
Connect the ater suppl hose
arning
!
To prevent leaage or ater damage,
this chapter. Do not in, crush or modif ater inlet hose.
Note
Connect manuall, do not use tools. Chec if the connections
are tight.
Remove the bolts
including the rubber
parts and eep them
for future use.
. Loosen the loc nut.
. Turn the foot until it reaches the
floor.
. Adjust the legs and loc the nuts
ith a spanner.
machine is level and stead.
Connect the ater
suppl hose to the ater
inlet valve and a ater
tap ith cold ater as
indicated.
Mae sure the
follo the instructions in
12
Close the holes
using the cover
caps.
against
V.1