Télécharger Imprimer la page

jakob GreenBlock 125 Instructions De Montage page 18

Publicité

Les langues disponibles

Les langues disponibles

7
Clean drilled holes
7.1 Remove the set screws.
7.2 Clean the drilled holes according to the product
instructions of the injection mortar.
8
Glue in set screws
8.1 Screw the lock nut minimally onto the set screw
and put the washer over the set screw.
8.2 Fill the first drilled hole with injection mortar.
8.3 Screw the set screw into the drilled hole and
ensure that the set screw does not protrude beyond
the base body. Allow mortar to harden. Hardening
time according to manufacturer's instructions.
8.4 Repeat steps 8.1 – 8.3 for the other anchor
points.
9
Set screws
9.1 Tighten the set screws to a tightening torque
tightening
of 40 Nm.
9.2 Cover the set screws with EPS roundels.
!
Observe correct hardening time!
E

Publicité

loading