4
Measure
4.1 Measure the X-dimension for determining the
X-dimension
drilling depth.
X =
!
X-dimension is the distance from the exposed
concrete surface to the outer edge of the plaster.
5
Place leveling
5.1 Join base body with doubling (if supplied).
mortar with base
5.2 Apply mortar to underside to level out any
body
unevenness.
5.3 Insert the base body into the hole and allow
the mortar to set. Hardening time according to
manufacturer's instructions.
6
Drill holes
6.1 Define the L dimension according to the table.
6.2 Mark drill bit with L dimension.
6.3 Drill holes until the mark from the drill bit is level
with the outer edge of the plaster.
6.4 Insert set screws to check drill hole depth.
X dimension
(mm)
> 120
> 140
> 160
> 180
> 200
> 220
> 240
> 260
mm
L dimension
Minimum concrete
(mm)
thickness (mm)
200
110
225
115
250
120
275
125
298
130
323
135
348
140
X + 102
145
X
!
Observe correct hardening time!
L
!
Observe the minimum concrete
thickness according to the table!
E