Télécharger Imprimer la page

jakob GreenBlock 125 Instructions De Montage page 14

Publicité

Les langues disponibles

Les langues disponibles

Assembly instruction GreenBlock 125
The GreenBlock 125 is a thermally separated high-load bracket
designed to carry the maximum loads of the GreenTrellis spacers.
E
Installation involves cutting open the existing facade, anchoring the
GreenBlock 125 and spacer, and sealing the penetration.
General notes
Ensure that the load-bearing capacity of the substrate is sufficient to
accommodate the forces that occur.
The components (nos. 21 – 30 and optionally no. 20 and 31) are included in
the scope of delivery of the GreenBlock 125. The tools (nos. 1 – 19) are not
part of the scope of delivery.
Assembly of components by trained personnel only.
No liability is assumed for the necessary safety precautions for proper
installation. No responsibility is assumed for the safety and integrity of all
persons involved and the surrounding area.
Installation video: jakob.com > Downloads > Videos

Publicité

loading