Télécharger Imprimer la page

IP Industrie ABT 2 Manuel D'instructions Et D'utilisation page 12

Publicité

Les langues disponibles

Les langues disponibles

Please unplug the device and wait 36 hours before any operation of maintenance or
cleaning.
· Each three months, or when it is necessary, remove the machine front panel and remove
the dust with a brush or better a vacuum cleaner or with an air compressor.
· Do not use corrosive substances (muriatic acid etcT), for the appliance cleaning use only
neutral detergents. (see also note on WARNING/INSTALLATION)
1)
Disassemble the frontal cover/panel (a)
2)
Loosen and remove metallic flap (b)
3)
Remove the pocket holder and the task, insert up side of new one in the plastic
nec, then assemble with pocket holder
4)
Fix the new task by tighten with metallic flap (b)
5)
Assemble the cover/panel (a)
a
All manuals and user guides at all-guides.com
MAINTENANCE and CLEANING
POCKET REPLACEMENT
b
If the chiller isn't used for a long time, is recommended
To cover the task with the cap provided
12
ENG
c

Publicité

loading

Ce manuel est également adapté pour:

Abt 3