MAN-NT-20000-SYM-C01-F
INSTRUCTIONS D'INSTALLATION
EN RÉFÉRENCE : ANSI/ALI ALIS : STANDARD FOR AUTOMOTIVE LIFTS - SAFETY REQUIREMENTS FOR INSTALLATION AND SERVICE
MISE EN GARDE
INSTALLATION DES COLONNES
1. SPÉCIFICATIONS DE PLANCHER : V
'
. V
L
INSTALLATION
OIR
BASE
6-1/2"
MIN
F
IGURE
ATTENTION
2. EMPLACEMENT DU GIROLIFT : S
G
SERA INSTALLÉ LE
IROLIFT ET MARQUER LA LIGNE CENTRE
L
A HAUTEUR MINIMALE DU PLAFOND OU TOUTE AUTRE STRUCTURE DOIVENT ÊTRE SITUÉES À PLUS DE
(
DÉGAGEMENT RECOMMANDÉ AU
3. ÉRECTION DES COLONNES :
MISE EN GARDE
3.1 À
'
'
L
AIDE D
UNE SANGLE DE LEVAGE ET D
LA FOIS LE PLUS PRÈS POSSIBLE DE SON SITE D
)
. V
DU POIDS
DE LA COLONNE
MISE EN GARDE
R
'
ISQUE D
ÉCRASEMENT
DESSUS DU SOL DE SORTE À LA FAIRE PIVOTER VERTICALEMENT
3.5 A
BAISSER LA BASE LE PLUS PRÈS DU SOL
3.6 P
OUSSER SUR LA BASE AFIN QUE LA COLONNE SOIT PERPENDICULAIRE
'
AU PLANCHER TOUT EN L
ABAISSANT SIMULTANÉMENT AU SOL
AVANT L'INSTALLATION, SE CONFORMER AU CODE DU BÂTIMENT INTERNATIONAL, AUX CODES
DE BÂTIMENT LOCAUX ET OBTENIR LES PERMIS SI REQUIS.
C
ONSULTER UNE PERSONNE QUALIFIÉE POUR TRAITER LES CHARGES SISMIQUES ET LES AUTRES EXIGENCES LOCALES OU
.
NATIONALES
S
I LES SPÉCIFICATIONS DE PLANCHER ET LES MESURES RECOMMANDÉES POUR L
PEUVENT RÉPONDRE AUX EXIGENCES
'
.
L
INSTALLATION
ÉRIFIER ET RENCONTRER LES SPÉCIFICATIONS DE PLANCHER AVANT DE PROCÉDER À
F
7.
IGURE
ANCRAGE
BÉTON
7 : B
ASE DE BÉTON
1. N
E PAS INSTALLER LE PONT ÉLÉVATEUR SUR DE L
2. N
E PAS INSTALLER LE PONT ÉLÉVATEUR DANS UNE FOSSE OU UNE DÉPRESSION
ELON LES DISTANCES RECOMMANDÉES DE LA
-
DESSUS DU PONT ÉLÉVATEUR
N
E PAS UTILISER DE CHAÎNE OU AUTRE MATÉRIEL ABRASIF DIRECTEMENT SUR LES PAROIS DES COLONNES QUI POURRAIENT
ENDOMMAGER LA PEINTURE LORS DES DÉPLACEMENTS
'
UN ÉQUIPEMENT DE MANUTENTION SÉCURITAIRE ET ADÉQUAT
'
INSTALLATION
F
8.
OIR
IGURE
3.2 D
ÉPOSER LA COLONNE AU SOL
3.3 D
ÉPLACER LA SANGLE DE LEVAGE AU
POINT DE PIVOT SOUS LE RAIDISSEUR
V
F
8.
OIR
IGURE
3.4 É
LEVER LA COLONNE DE
.
,
COMMUNIQUEZ AVEC LE MANUFACTURIER DU
SPÉCIFICATIONS DE
PLANCHER
É
PAISSEUR DE BÉTON
C
OMPOSITION
C
APACITÉ
Q
UALITÉ
'
ASPHALTE OU TOUT AUTRE COMPOSÉ SIMILAIRE OU INSTABLE
F
.
)
.
;
PLACER LA SANGLE DE LEVAGE AU CENTRE DE GRAVITÉ
POINT DE PIVOT
.
.
1"
-
AU
.
.
'
INSTALLATION DU PONT ÉLÉVATEUR NE
G
IROLIFT AVANT DE PROCÉDER À
VALEURS
6-1/2"
MINIMUM
B
ÉTON AVEC ARMATURES
C
ONTRAINTE DE SURFACE À
A
NCRAGE À PLUS DE
'
D
UN JOINT
;
RISQUE DE FEU OU D
5,
IGURE
MARQUER AU PLANCHER L
,
AMENER UNE COLONNE À
(
RÉPARTITION ÉGALE
RAIDISSEUR
SUPPORT À RALLONGES
F
8 : P
IGURE
OINT DE PIVOT ET CENTRE DE
GRAVITÉ SUR UNE COLONNE AU SOL
RÉVISION: 2023-02-28
4000 PSI (30MP
)
A
12"
'
D
UNE FISSURE OU
.
'
.
EXPLOSION
'
ENDROIT OÙ
154-1/4"
.
DU SOL
CENTRE DE GRAVITÉ
RAIDISSEUR
8 |
P
A G E