Télécharger Imprimer la page

FGE FARELEK 112501 Mode D'emploi page 51

Publicité

Les langues disponibles
  • FR

Les langues disponibles

  • FRANÇAIS, page 1
G : GASLEAK and FINALISATION OF INSTALLATION
G1- First test
• Put soapy water or bleed detector spray on the connector
• Be sure that no small bubbles appearead which indicated gas bleed.
G2- Second test :
• redo one more time this operation after switch on during one hour running
•If you do not have any escapes, you can finalize the installation.
G3- Finalisation of installation
1
• Bind the assembly with the roll
of plastic film, using a tightening
force to keep it in firmly place.
H : EMERGENCY SWITCH USE
•Only on the models which are equipped with it.
• If the remote control batteries are uncharged or the remote control has a fault, use the safety switch.
112501-505-506-507-H.indd 51
All manuals and user guides at all-guides.com
2
• Block up the hole in the
wall with the mastic.
© FAR GROUP EUROPE
.
3
• et the two half-shells in place,
then finish the interior blocking
with the rest of the mastic.
EN
10/02/06 8:11:54

Publicité

loading

Produits Connexes pour FGE FARELEK 112501

Ce manuel est également adapté pour:

Farelek 112505Farelek 112506Farelek 112507Farelek 112495