Télécharger Imprimer la page

FGE FARELEK 112501 Mode D'emploi page 45

Publicité

Les langues disponibles
  • FR

Les langues disponibles

  • FRANÇAIS, page 1
E5- Indoor unit fixation :
• Pass the electrical cable on the water evacuation and copper pipes trough the wall and hold the indoor unit
on its supports.
• the copper pipe is annealed, so manipulation must be soft, non repeated, and minimal radius ( R = 5 cm )
E6- evacuation connection :
• For easy evacuation of the condensation water, the emptying hose must be inclined downwards.
• If the emptying hose connected to the internal unit proves to be too short, it can be extended using the
hose provided in the accessories.
• If the emptying hose has to cross the house, it must be enveloped with special thermal insulation
materials.
1
The arrangement in diagrams 2 to 5 is incorrect.
2
Water
leak
Inclined upwards
112501-505-506-507-H.indd 45
All manuals and user guides at all-guides.com
Inclined downwards
3
Water
leak
Stagnant water
© FAR GROUP EUROPE
4
Water
leak
water Flexible
EN
5
50mm or more above
the ground
10/02/06 8:11:13

Publicité

loading

Produits Connexes pour FGE FARELEK 112501

Ce manuel est également adapté pour:

Farelek 112505Farelek 112506Farelek 112507Farelek 112495