Télécharger Imprimer la page

HAMPTON BAY VFB25ACLED Guide D'utilisation Et D'entretien page 8

Ventilateur d'aération

Publicité

Les langues disponibles

Les langues disponibles

I nstallation (continued)
5 B
4
16 – 24 in. joist installation
Use long wood screws (BB) to loosely attach the
main body of the fan to one ceiling joist in the two
locations shown.
Extend the hanger bars to the opposite ceiling joist.
Secure the suspension brackets (B, C, and D) to
the joist using long wood screws (BB).
Ensure the main body is level and square to the
joists.
Tighten all screws.
BB
B
D
BB
NOTE: Fan body should hang down from joists
approximately 0.5 in. to match finished ceiling material.
5
Duct connection
Install a circular duct (F) to outlet and secure it with
duct tape or clamps to the outlet.
Install the duct with a gradient of 1˚ ~ 2˚ to the
outside as shown.
BB
8
F

Publicité

loading

Ce manuel est également adapté pour:

985-893