Télécharger Imprimer la page

Jonsered J208D17 Manuel De L'opérateur page 7

Masquer les pouces Voir aussi pour J208D17:

Publicité

Les langues disponibles

Les langues disponibles

INSERT CABLE CLIP (See Fig. 6)
Insert plastic cable clip into hole on the back of handle
column. Push cables into clip.
HANDLE
COLUMN
CONNECT SHIFT ROD (See Fig. 7)
Insert end of shift rod into hole of shift lever indicator.
Insert hairpin clip through hole of shift rod to secure.
ATTACH THIS END TO SHIFT LEVER IN DI CA TOR
SHIFT ROD
HAIRPIN CLIP
SHIFT ROD
ASSEMBLY
CABLE
CLIP
CABLES
Fig. 6
SHIFT LEVER INDICATOR
Fig. 7
REMOVE TILLER FROM CRATE
Make sure shift lever indicator is in "N" position (See
Fig. 7)
Tilt tiller forward by lifting handle. Separate cardboard
cover from leveling shield.
Rotate tiller handle to the right and pull tiller out of
carton.
CHECK TIRE PRESSURE
The tires on your unit were overinflated at the factory for
shipping purposes. Correct and equal tire pressure is
important for best tilling performance.
Make sure tires are properly inflated to the PSI shown
on tires.
HANDLE HEIGHT
Handle height may be adjusted to better suit operator.
(See "TO ADJUST HANDLE HEIGHT" in the Service
and Adjustments section of this manual).
7

Publicité

loading