STEP 5
1) Attach the Pull Unit (09) to the Bridge Tube (08), insert the Axle for Pull Unit (19)
throughX4 Powder Metal Ring (31), X2 Flat Washer (35) and tighten by X2 Nylon Nuts
(39).
2) Attach the Butterfly Arm R (10R) to the right side of Pull Unit (09) through X2 Powder
Metal Ring (31) and X1 Flat Washer (35) and tighten by X1 Nylon Nut (39).
3) Do the same procedure for the Butterfly Arm L (10L) to the Pull Unit (09) by same parts.
4) Attach the Connecting Bolt (18) onto the Upright Support Tube (02), tighten by X1 Hex
Head Bolt(23), X2 Flat Washer (37). Put the Knob (67) onto the Connecting Bolt (18) by
through Flat Washer (36).
5) Put the Foam for Butterfly Arm (53) onto the R/L Butterfly Arm (10R & 10L) and adjust to
certain position.
6) Attach the Handlebar (11) onto the Butterfly Arm R (10R), tighten by X1 Washer (33)
and X1 Hex Head Bolt (22). Do the same procedure of Butterfly Arm L (10L) with the other
Handlebar (11).
7) Attach the Pulley Bracket (17) onto the 2 sides of Upright Support Tube (02), tighten by
X2 Hex Head Bolt (24), X4 Flat Washer (35) and X2 Nylon nuts (37) for 2 sides.
12