3. Inverter status descriptions
The P2 SunRise starts up automatically when DC-power from the PV panel is sufficient.
Once the PV-Inverter starts, it enters into one of the following status:
Operation
LCD panel display
mode
Normal
Standby
Error
EPO
Shutdown
INFOSEC UPS SYSTEM - 4, rue de la Rigotière - 44700 Orvault - FRANCE - www.infosec-ups.com
22
Hot Line – Tel + 33 (0)2 40 76 15 82 - Fax + 33 (0)2 40 94 29 51 - hotline@infosec.fr – 04 10 AA 68 203 18
All manuals and user guides at all-guides.com
Description
In this mode, the P2 SunRise runs
normally. Whenever the supplied power
from PV panel is sufficient
(500VDC>PV>120 VDC ), the P2
SunRise converts power to the grid as
generated by the PV panel. In normal
mode, the green LED is on to indicate
that it feeds power to the grid.
If the power is insufficient,
(60VDC<PV<120VDC) the P2 SunRise
enters into a standby mode but attempts
to connect to the grid.
The internal intelligent controller can
continuously monitor and adjust the
system status. If the P2 SunRise finds
any unexpected conditions such as grid
problems or internal failure, it will display
the information on its LCD and light up
the red LED.
Emergency Power Off mode. In this
mode, the P2 SunRise does not take any
power from the grid.
In case of little or no sunlight, The P2
SunRise automatically stops running. In
this mode, the P2 SunRise does not take
any power from the grid. The display
and all of the LEDs on the front panel do
not work.