Guide d'installation/
1. For each battery, set the ON/OFF switch to the ON position.
2. On the master battery, then press the SW button for 3 seconds.
The RUN indicator will light up and the SOC indicator ill light up
(100% SOC status in the figure below).
3. Use a voltmeter and check that the voltage at the terminals of the
battery system is above 42V.
4. After confirming that the battery output voltage and polarity are
EN
correct, turn on the inverter and close the circuit breaker.
5. On the inverter, from the setup interface, please select the IMEON
FR
FR
4850 battery (see inverter installation guide).
6. Check the connection indicator between inverter and battery
(communication indicator and battery access status indicator).
7.
Battery modules can be connected in parallel up to 36 units.
IM4850DA_guide_installation_v.A.3
Installation guide
4850
41/ 43