– Remove heater and all packaging materials
from the shipping carton.
Tip: Be sure to remove the hardware
package from the Styrofoam packaging.
Ceiling Mounting
1. Locate wood stud in ceiling where heater will
be mounted.
2. Use swivel bracket to mark 4 holes for
drilling. Be sure a minimum of 2 holes (across
swivel bracket from each other) will be drilled
into wood stud in ceiling.
3. Pre-drill 4 holes for screws.
4. Attach swivel bracket to ceiling using 4
washers and screws (attach 2 screws to
stud, then turn 90 degrees to attach 2 final
screws.) Two (2) screws must be attached to
a wood ceiling joist (min 1.5"). If 2 remaining
screws cannot be attached to a wood ceiling
joist, then moly / toggle bolts should be used
for remaining holes.
HEATER MUST bE
WARNING
ATTACHED TO A jOIST
WITH A MINIMUM OF TWO (2) SCREWS IN
OPPOSING HOlES.
If you are attaching this
WARNING
heater to a ceiling surface
other than a wood ceiling joist and drywall,
please use appropriate fasteners. The
screws included with your heater are not
intended to be used for metal joists.
© 2014, Pinnacle Products International, Inc.
NEVER LEAVE HEATER UNATTENDED WHILE
CONNECTED TO A POWER SOURCE
Assembly Instructions
Tools Needed:
– Power Drill
– 4 mm or 5/32 in. drill bit
– Phillips head screwdriver
– Stud finder
Attaching Heater to Swivel Bracket
1. Line up holes on swivel bracket with the
2. Attach heater to swivel bracket with
heater to swivel bracket.
6
Tip: Seek assistance when installing
heater.
holes on the heater shell.
adjustment knobs larger 8 mm washers and
locking washers. (Page 5)
Be certain adjustment knobs
WARNING
are tightened firmly to secure
Garage Heater User's Manual