Télécharger Imprimer la page

NewAge Products Bold 3.0 Serie Instructions D'installation page 14

Masquer les pouces Voir aussi pour Bold 3.0 Serie:

Publicité

Les langues disponibles

Les langues disponibles

Mounting Cabinets (Drywall/Studded Wall)
Parts Required
Wall Screw
(1/4" x 2.5")
Wall & Locker: 4 wall screws and 4 washers
Corner Wall: 6 wall screws and 6 washers
Base & Tool Cabinet: 2 wall Screws and 2 washers
Place cabinet tight
2
against the wall.
Drill 4 wall screws and washers
5
through perforated holes into studs.
14
All manuals and user guides at all-guides.com
Wall Washer
(1/4")
Align cabinet
3
to stud marks.
X4
Use stud finder to locate the studs
1
and mark the wall with a pencil.
Level cabinet by
4
adjusting feet
Masonry.
• Follow steps 2 to 4.
• Drill 4 pilot holes through the
perforated strip with hammer drill &
masonry bit.
• Follow Step 5 using:
• Use 4 x ( 2 ¼" x ¼" )Tapcon Concrete
Anchor into wall. (Not Included)
• OR 4 x (#10 x 2" )Screw with 3/16"
masonry plug into wall. (Not Included)

Publicité

loading