H-5101
SHOWER EYEWASH STATION
• Assemble unit in accordance with the
manufacturer's drawing.
• Install in close proximity to hazard and in a location
clearly identified and without obstructions.
• Place shower head 82-96" from the surface at which
the user stands.
• Position center of spray pattern at least 16" from any
obstruction.
• Arrange spray heads 33-45" from the surface at
which the user stands and a minimum of 6" from any
obstruction.
• Connect unit with a recommended minimum 1¼"
NPT line to a tepid, potable water source capable of
supplying 30-80 psi flowing pressure for a minimum
of 15 minutes.
• If shut valves are installed, inline provisions should
be made to prevent unauthorized shutoff.
• Protect unit from freezing.
• Check for any leaking while all valves are in the
closed position.
• Keep valves in the open position upon activation.
PAGE 1 OF 9
1-800-295-5510
uline.com
INSTALLATION
• With the shower valve in the fully opened position,
spray pattern should be a minimum of 20" in
diameter at 60" above the surface at which the user
stands. Determine flow rate is at least 20 GPM and
the water is tepid.
• With eyewash valve in fully opened position and
using a test gauge, the spray pattern should meet
required pattern. Determine flow rate is at least 0.4
GPM and the water is tepid.
Para Español, vea página 4-6.
Pour le français, consulter la page 7-9.
0922 IH-5101