Installation Instructions
9.
Insert banding guide into expediter and snap into place.
10.
Mount expediter to pipe using pipe band. Do not band over
cable. If necessary, temporarily mount junction box base
on expeditor.
11.
Push excess cable and capillary tube back through expediter.
Tighten cap securely. Tape cable expansion loop to pipe.
12.
Fix thermostat bulb and capillary tube to pipe.
13.
Take out thermostat. Mount junction box base on expediter.
Make sure to align slots to properly orient junction box base.
Tighten nut with Terminator-LN-Tool. If mounting horizon-
tally, threaded gland holes must face downward.
14.
Install M25 power gland and M25 blind plug.
15.
Install power cable.
16.
Install thermostat and complete system wiring. Terminal
set screws shall be tightened to a torque value of 1.4 Nm
(12.4 lb-in). See page 4 for wiring details. Set thermostat at
desired setpoint.
3