Télécharger Imprimer la page

Samsung GN641FDXD1 Manuel D'installation Et D'utilisation page 14

Publicité

Les langues disponibles

Les langues disponibles

Gas Conversion
■ Be careful, the operations and adjustments to be carried out when converting
from one gas to another.
■ All work must be carried out by a qualified technician.
■ Before you begin, turn off the gas and electricity supply to the appliance.
1
Change the injector of the burners.
Remove the pan support, Burner lid and Flame spreader.
Unscrew the injector using a 7mm box spanner and replace it with
the stipulated injector for new gas supply. ( see table 1. Page 27.)
Carefully reassemble the all components.
After injectors are replaced, it is advisable to strongly tighten the
injector in place.
Injector
2
Adjusting of the taps of the cooking hob burners for
reduced consumption
➀ Turn the taps down to minimum.
➁ Remove the control handles from taps.
Control handle
➂ Adjusting the by-pass screw.
- For converting G20 into G30 or G31, the screw must
Tap
Sealing ring
- At this stage, light up the burners and turn the
Tap
- For converting G30 or G31 into G20, please contact
by-pass screw
➃ Replace the control handles on the taps.
■ Do not dismantle the tap shaft : in the event of a malfunction, change the whole tap.
■ Before placing the burners back on the top place, make sure that the injector is
not blocked.
■ A full operational test and a test for possible leakages must be carried out after
gas conversion. (such as soap water or gas detector)
■ After completing conversion, a qualified technician or installer has to mark "V"
on the right gas category
to match with the setting
in rating plate.
Remove the previous
GN642JDXD1
setting "V" mark.
All manuals and user guides at all-guides.com
be screwed down fully tight.
control handles from max position to minimum
position to check flame stability.
"After-Sales Service".
ELECTRONICS
S/N: V1PT79MC300001
G20/20mbar
220-240V 50/60Hz
∑Qn Q20:8.3kW G30:591g/h G31:570g/h
GB Cat.: ll 2H3+
G20-20mbar
G30/29mbar
G31/37mbar
26
Burner Features
Nominal heat input and flow rates see below at 15˚C at 1,013 mbar.
COUN-
TYPE OF
TRY
GAS
GB,IT
FR,HU
G-30
BE,LT
BUTANE
NL,PT
29 mbar
ES,CZ
SK
G-30
PL
BUTANE
36 mbar
GB,IT
G-31
FR,BE
LT,PT
PROPANE
ES,CZ
37 mbar
SK
GB,IT
FR,BE
G-20
LT,PT
NATURAL
PL,ES
20 mbar
CZ,SK
G-20
HU
NATURAL
25 mbar
0063
- Aeration adjustment none
BURNER
Triple-Crown
Rapid
POSITION
Max
Max
Min
Min
Injector make
85
98
(1/100 mm)
Nominal heat input
0.75
3.8
2.7
3.0
(Kw)
Nominal flow rates
53
267
193
211
(L/h)
Injector make
93
80
(1/100 mm)
Nominal heat input
0.85
3.8
2.7
3.0
(Kw)
Nominal flow rates
259
185
58
203
(L/h)
Injector make
85
98
(1/100 mm)
Nominal heat input
2.5
3.8
3.0
0.7
(Kw)
Nominal flow rates
254
177
199
49
(L/h)
Injector make
135
119
(1/100 mm)
Nominal heat rating
3.8
1.4
3.0
0.78
(Kw)
Nominal flow rates
361
129
271
79
(L/h)
Injector make
128
110
(1/100 mm)
Nominal heat input
3.8
1.4
3.0
0.84
(Kw)
Nominal flow rates
350
129
271
79
(L/h)
Burner
Calibrated orifice 1/100mm
Auxiliary
Semi-rapid
Rapid
Triple-Crown
27
(Table 1)
Semi-rapid
Auxiliary
Total
Max
Max
Min
Min
65
50
-
1.75
0.43
1.0
0.37
11.3
25
120
31
71
62
47
-
1.75
0.48
1.0
0.38
11.3
125
25
33
71
65
50
-
1.75
0.4
1.0
0.33
11.3
118
28
68
23
97
72
-
1.75
0.51
1.0
0.29
11.3
54
166
91
30
91
68
-
1.75
0.57
1.0
0.32
11.3
54
166
91
30
31
34
45
65

Publicité

loading