Télécharger Imprimer la page

Paramount EDC 004-152-4516-00 Manuel D'installation page 7

Publicité

Les langues disponibles

Les langues disponibles

PLUMBING THE EQUIPMENT SIDE CANISTER
WARNING
Pump
8" Minimum
Straight Pipe
All Suction Header
OPTION 1:
ALL SUCTION PIPES
GOING TO EDC
Plumb the suction header as you
normally would. From the suction
header plumb the suction line into
the inlet port of the EDC. There
must be 8" of straight pipe between
the pump and any fittings.
This debris canister should only be installed
on the suction side of the system.
Filter
Isolated
Suction Port
7
Pump
8" Minimum
Straight Pipe
OPTION 2:
SINGLE SUCTION
ITEM ON EDC
Plumb a suction line from an outlet
fitting to the inlet port of the EDC.
From the bottom outlet of the EDC
go directly into the header with
other suction items. There must
be 8" of straight pipe between the
pump and any fittings.
Filter
Other Suction
Header Items

Publicité

loading