All manuals and user guides at all-guides.com
ASSEMBLY
Step 4
Attach the wing nut ( d ) to base (16). Attach base (16) by rotating to vertical position and lowering it into the center of the
side panels. Rotate base (16) to horizontal position and attach with M6x25 (b) screws – 4pc. Attach the control knob (6).
Please be mindful of the direction of the knob ( 6 ) when you install it. Finally tighten all screws from step 1 to step 4.
Note :the base's direction
16
Note :the base's direction
b
16
6
Step 5
Place lava rocks. Turn unit upright.
Do Not cover pilot hosing.
9