Télécharger Imprimer la page

Cooper Crouse-Hinds EPL Serie Instructions Pour L'installation Et L'entretien page 2

Publicité

Les langues disponibles

Les langues disponibles

3.
Insert insulating plates, one at the top of the chassis and the second below the
bottom most breaker position per the following picture.
Actuator Plate
Mounting Bracket
Note: Adjusting actuator plate mounting bracket may be necessary to securely
position insulating plate.
NOTE: If an odd number of circuits are being used in the panel, non-operable
(dummy) breakers have been included to balance the spacing. Installation of
these non-operable breakers is required to insure proper operation.
4.
Reinstall actuator plate and be sure the insulating plates protrude through the
actuator plate.
5.
Close enclosure cover making sure that bolts are retracted to prevent
scratches or damage of the flange surface. Using only the bolts provided with
the enclosure, tighten all bolts to 40-45 lbs.-ft. (19.2 to 21.5 N-m)
6.
Make sure all screws and bolts are tightened to the appropriate torque values
found in Chart 1 on page 2.
C. Adding a space heater (EPL R22 KIT)
Do not scratch or damage flat joint flame path on either cover or body.
Always clean both body and cover from dust and foreign particles prior to
closing. Dirt or foreign material must not accumulate on flat joint surfaces.
Personal injury or equipment damage can result from a compromised or
damaged flat joint flame path.
1.
De-energize panel, open circuit breaker enclosure and make sure bolts are
retracted in cover.
2.
Attach heater with hardware provided to bottom-most position in circuit breaker
enclosure.
3.
Attach wire from newly installed circuit breaker or external power source.
NOTE: Wiring of heater is dictated by customer preference.
IF 1517 • 04/07
All manuals and user guides at all-guides.com
Dummy Breaker
NOTE
WARNING
Copyright © 2007, Cooper Industries, Inc.
4.
Close enclosure cover making sure that the flange is clean and that bolts are
tightened to proper torque value (40 to 45 lbs.-ft.). (19.2 to 21.5 N-m)
5.
Make sure all screws and bolts are tightened to the appropriate torque values
found in Chart 1 on page 2.
D. Adding an operator handle cover (EPL HG24 KIT; EPL HG36 KIT;
EPL HG42 KIT)
1.
Mount operator cover on lockout plates while securely holding in place.
2.
Securely fasten operator cover hinge to lockout plate with hinge screws and
nuts provided.
E. ADDING A TERMINAL HOUSING MOUNTING BRACKET (EPLA MTG KIT;
D2LS MTG KIT)
1.
Locate bracket on existing terminal housing mounting feet.
2.
Fasten bracket to mounting feet using hardware provided.
When installing panelboard, always secure circuit breaker enclosure
mounting prior to securing terminal housing mounting.
3.
Secure bracket to desired mounting position.
F. Adding a gland plate hub kit
Note: With a D2LS style panel, the following gland plate hub kits are available:
D2L HUB2 KIT
(1) 3", (12) 3/4"
D2L HUB3 KIT
(1) 3", (12) 1"
D2L HUB5 KIT
(1) 3", (12) 1-1/2"
D2L HUB0 KIT
No entries for replacement of damaged plates
The gland plate gasket is adhered to the enclosure. When removing gland
plate, do not compromise or damage gasket.
1.
Remove existing gland plates from terminal housing.
2.
Install Myers hubs to new gland plate wrench tight.
3.
Install gland plate kit and tighten screws to the appropriate torque values found
in Chart 1.
Cooper Crouse-Hinds recommends attaching side gland plates with entries
adjacent to the center gland plate.
CAUTION
CAUTION
NOTE
Page 2

Publicité

loading

Ce manuel est également adapté pour:

Crouse-hinds d2l serie