Télécharger Imprimer la page

Publicité

Liens rapides

5
FOR THE UK
Domestic hot water installations must be installed, commissioned
and maintained by a competent person in accordance with Building
Regulation G3 (England and Wales), Technical Standard P3
(Scotland) or Building Regulation P5 (Northern Ireland) and the
Water Fitting Regulations (England and Wales) or Water Byelaws
(Scotland). As such, the installed cylinder must comply with the
above mentioned regulations.
To comply, the required safety devices can include, but are not limited to:
- a thermal cut out
- a temperature / pressure relief valve
- a motorised 2-port valve to interrupt the flow in case of high temperature
- other if required according to (local) regulations
T h e h y d r a u l i c a n d w i r i n g d i a g r a m b e l o w s e r v e a s i n s t a l l a t i o n e x a m p l e o n l y
M
i
M
M
EKHY3PART2
*HYHBH0*AAV3*
*HYHBX08AAV3*
*HYKOMB33AA*
[E-06]: 1
[E-07]: 6
[6-0D]: 0
# 6.1.3
# 6.8.2.2 = 3F94
x
40
60
°C
x = y
Mon 15:20
Tank
y°C
Desired temperature
40°C
60°C
40 < y < 60
EKHY3PART2

Publicité

loading

Sommaire des Matières pour Daikin EKHY3PART2

  • Page 1 T h e h y d r a u l i c a n d w i r i n g d i a g r a m b e l o w s e r v e a s i n s t a l l a t i o n e x a m p l e o n l y EKHY3PART2...
  • Page 2 EKHY3PART2 EKHY3PART2 > 3 / 4 " < 8 5 C > 0 . 4 5 m ² > 3 / 4 " E x a m p l e - E x e m p l e - E j e m p l o - B e i s p i e l - E s e m p i o - V o o r b e e l d - P ř í k l a d - E x e m p l o -...