1 . Visual inspection carried out
heating tape
connector systems
automatic control equipment
2 . Function check carried out
Connect the heating tape to the power supply (a temporary connection to the construction site power
supply is also possible). The earth leakage breaker and fuse must not trip.
Each heating tape end has to be lukewarm after 5 to 10 minutes (put hand on tape).
3 . Insulation resistance measurement carried out
Use an insulation tester with a minimum test voltage of DC 500 V and a maximum test voltage of DC 2000 V.
The insulation resistance should be at least 50 MΩ per heating circuit, independently of its length. The test is
carried out between each supply line and the protective braid armour, and between protective braid armour and
the earthed piping.

General Information

Heating circuit no.
Heating circuit length (m)
Insulation resistance
Function check carried out
Visual inspection carried out
Note
A proper visual and functional inspection is possible only if carried out prior to the
installation of the heat insulation.
All warranty claims are subject to the submission of a correctly and completely filled-
in acceptance report.
Make sure to add date and signature.
Above requirements checke:
Date/place:
Reservation
We reserve the right to make technical changes. Changes, mistakes or print errors do not justify any claims to damages.
(according to the Danfoss installation instructions)
date:
(according to the Danfoss installation instructions)
date:
(according to the Danfoss installation instructions)
1
2
> MΩ
Company/signature test engineer Company/signature customer
Signature:
Signature:
date:
Signature:
3
4
> MΩ
> MΩ
5
> MΩ
> MΩ