Best CP55IQ Serie Guide D'installation page 7

Masquer les pouces Voir aussi pour CP55IQ Serie:
Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

4. MOUNT CUSTOM HOOD INTERNAL FRAMEWORK
The wood hood must be positively secured to wall studs or other wooden framework behind the drywall. Make
sure it is capable of supporting its own weight and the weight of the CP55IQ, CP57IQT or CP57E. Failure to do so
may cause personal injury or damage to countertop or cooktop.
The CP55IQ, CP57IQT and CP57E power pack is supported by the custom hood internal framework with screws provided in parts bag.
Since the CP55IQ, CP57IQT and CP57E power pack mounting holes are located in
front and rear sides (see illustration at right), plan to install wood frame at front and
sides for support.
5. REMOVE HYBRID BAFFLE FILTERS
Remove tape on filters. Remove filters from power pack and set aside.
It is recommended to start with the center one(s).
6. REMOVE GREASE DRIP RAIL
A. Lift grease drip rail to disengage it from the bottom
panel.
B. Slide grease rail all the way to the left or right () and
lift the opposite end to disengage the other end from
the bottom panel (). Remove it from the power pack
and set aside for later use.
WARNING
!
A
HD0524
7
HH0102A
HD0521
B
HD0525

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

Cp57iqt serieCp57e serie

Table des Matières