Hardware Installation - Grandstream Networks GWN7600LR Guide D'installation Rapide

Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

  • FRANÇAIS, page 13
https://arttel.ru/
Step 2: Plug the other end into the uplink port of the power over Ethernet
(PoE) switch.
Network Port

HARDWARE INSTALLATION

GWN7600LR can be mounted horizontally or vertically on a metal bar.
Please refer to the following steps for the appropriate installation.
Vertical Mounting
1. Prepare the Cover Bracket by inserting the 4 screws (PM8) into cor-
responding holes.
2. Attach the Cover Bracket with screws on the vertical Mounting Bolt
where GWN7600LR will be installed.
3. Assemble the Base Bracket with the Cover Bracket using provided
locknuts and screws (PM8).
1
https://arttel.ru/shop/tochki-dostupa/grandstream-gwn7610
All manuals and user guides at all-guides.com
RJ45 Ethernet Cable
to power over Ethernet
(PoE) Switch
3
2
~3~
4. Connect the Ethernet cable (RJ45) to the correct ports of your GWN-
7600LR.
5. Align the GWN7600LR with the Base Bracket and pull it down to the
right position.
6. ,QVWDOO WKH [ $VVHPEOHG VFUHZV WR ¿[ *:1
Bolt.
4
Horizontal Mounting
1. Prepare the Cover Bracket by inserting the 4 screws (PM8) into cor-
responding holes.
2. Attach the Cover Bracket with screws on the horizontal Mounting Bolt
where GWN7600LR will be installed.
3. Assemble the Base Bracket with the Cover Bracket using provided
locknuts and screws (PM8).
2
1
~4~
/5 RQ WKH 0RXQWLQJ
5
3

Publicité

Table des Matières
loading

Table des Matières