2-10. Positioning Jumper Links
Tools Needed:
3/8 in
2-11. Installing Work Clamp
1
Tools Needed:
1/2 in
OM-194 430 Page 14
All manuals and user guides at all-guides.com
200 VOLTS
230 VOLTS
230 VOLTS
460 VOLTS
460 VOLTS
575 VOLTS
S-144 918-C
2
1
3
S-144 916-A
2
3
Check input voltage available at
site.
1
Jumper Links Access Door
Open door.
2
Jumper Link Label
3
Input Voltage Jumper Links
Move jumper links to match input
voltage.
Close and secure access door.
Close door.
Ref. ST-801 789-A
1
Work Cable
2
Hardware
3
Work Clamp
Route cable through clamp handle
and secure as shown.
Ref. ST-802 062