All manuals and user guides at all-guides.com
English 04/00
6 Sample Applications
Testing the complete PROFIBUS-DP
•
No master may be connected to the bus.
•
The "life list" can also be generated with a re-
peater and optical paths.
•
Parts of the system can be tested in advance
without the master for their bus functionality.
Fig. 7
Sample test 1
Page 20
(S)J31069-D0075-U001-A2-6318
BT 200