3-6. LCD Setting
There are three parameters to set up the UPS. Refer to the following diagram.
Parameter 1
Parameter 2
List of 20 programs available for parameter 1:
Code
Description
Output voltage
01
Output frequency
02
Voltage range for bypass
03
Frequency range for bypass
04
Reserved
05
Reserved
06
Reserved
07
Bypass mode setting
08
Battery maximum discharge time setting
09
Reserved
10
Reserved
11
12
Reserved
13
Battery voltage Calibration
14
Reserved
15
Inverter voltage Calibration
16
Floating charger voltage adjustment
17
Constant charger voltage adjustment
18
Charger maximum current setting
19
Battery capacity and groups setting
20
Backup time calibration
*Y (YES) means that this program can be set in this mode.
01: Output voltage
Interface
INFOSEC UPS SYSTEM – 4 rue de la Rigotière – 44700 Orvault – France – www.infosec-ups.com
47
Hot Line Tel : +33 (0)2 40 76 15 82 – fax : +33(0)2 40 94 29 51 – hotline@infosec.fr – 03 16 AA 59 203 26
Parameter 3
Setting
Parameter 3: Output voltage
You may choose the following voltage in parameter 3:
208: output voltage is 208VAC
220: output voltage is 220VAC
230: output voltage is 230VAC
240: output voltage is 240VAC
Parameter 1 is for program alternatives. There
are 20 programs to set up. Refer to the table
below.
Parameter 2 and parameter 3 are the setting
options or values for each program.
NOTE: Select "Up3 or "Down" buttons to
change the programs or parameters.
Bypass
AC
CVCF
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Battery
Battery Test
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y