Field Controls STARKAP VENT CAP SK-1 Mode D'emploi page 3

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

INSTALLATION
1. Before installation, apply two beads of high temperature
silicone sealant or equivalent around the bottom of the storm
collar and 1 inch above the end of the Starkap™ body. (See
Figure 2)
2. Insert the Starkap™ into the inside of the vent termination
pipe, making sure the Starkap™ is seated against the storm
collar. Fasten the Starkap™ to the vent termination pipe by
using three (3) sheet metal screws. Placement of the screws
should be approximately 1/2 inch from the end of the vent termination pipe. (See Figure 3) The
heads of the screws should be covered with high temperature.
Page 3
Figure 2
Figure 3

Publicité

Table des Matières
loading

Table des Matières